318 N. Carpenter

scope of work

  • 3 Level Earth Retention System
  • 40 Caissons Installed
  • 16,000+ SF of Sheeting Installed
  • Drilling Up to 85' Deep

SERVICES

Deep Foundation
Earth Retention

WORK COMPLETED

October 2019

Download Project Page

Project Summary

Stalworth was contracted to install 40 caissons to serve as the deep foundation for a new office building in Chicago. Additionally, we were contracted to provide an earth retention system to allow for site excavation. The earth retention system designed was a 3 level braced sheet pile system with pre-stressed braces to provide the safest retention of the neighboring buildings.

Prev Project United Airlines Hangar
Back To All
Next Project BNSF Retaining Wall 5.30N