CDOT Addison Underbridge

scope of work

  • 29,000+ Sq Ft of Sheeting Installed
  • 7,000 Sq Ft of Soil Retained
  • Excavations up to 14'
  • 80+ Tie Rods Installed
  • 8 Separate Systems Installed Along the Chicago River

SERVICES

Earth Retention
Marine Work

WORK COMPLETED

April 2019

Download Project Page

Project Summary

Stalworth installed 29,000+ square feet of sheet piling and 83 tie backs to create the foundation of the Addison Underbridge trail. This project was performed along the North Branch of the Chicago River utilizing all equipment from the shoreline. The 83 tiebacks installed totaled 2,700 feet in total and were spread across 1,200 feet of waler.