Projects

York Township Salt Dome

Deep Foundation
  • 40+ Shell Piles Installed
  • 60'+ Piles

View Project

Winnetka Bluff Restoration

Deep Foundation
  • Installed 88 Helical Piers
  • First Helical Job Constructed at Winnetka Beach
  • Performed on a Steep Bluff

View Project

Walgreen’s Skywalk Addition

Deep Foundation
  • Value Engineered the Project Reducing Drilling Time
  • Tight Site with Active Foot and Vehicle Traffic
  • Over 60 Caissons Installed

View Project

United Airlines Hangar

Deep Foundation
  • Over 200+ H-Piles Installed
  • Piles Over 70'+ Deep
  • 15,900 Feet of Pile Installed

View Project

Spirit Airlines – Concourse G & L Gate Swap

Deep Foundation
  • Drilled 4 Shafts for a Passenger Walkway
  • Cored Through Obstructions at Every Shaft
  • Mobilized and Operated in an Active Airport

View Project

MWRD Stickney Tanks & Grit Building

Deep Foundation
  • 1,800+ Steel H-Piles Installed
  • 28 Micropiles
  • 18,500+ SF of Earth Retained

View Project

Lathrop Homes

Deep Foundation
  • 30,000+ SF of Sheeting Installed
  • 44 Belled Shafts Drilled
  • 55 Soldier Piles Installed

View Project

IHBRR Bridge 47C

Deep Foundation
  • Work Performed at Four Different Bridge Locations
  • Installed 44 Piles for a New Abutment
  • 35 Soldier Piles Installed for ERS

View Project

CNRR St Charles Line Bridges

Deep Foundation
  • Low Clearance Micropile Drilling
  • 210 Micropiles Installed
  • Multiple Micropile Tests

View Project

CDOT Washington & Wabash CTA Station

Deep Foundation
  • 135 Micropiles Installed
  • 140+ Soldier Piles Installed
  • 1000'+ of Waler Installed

View Project

CDOA Midway Passenger Security Checkpoint Expansion Project

Deep Foundation
  • $1 Million+ in Value Engineered Savings
  • 75 Caissons Drilled
  • 62 Micropiles Installed

View Project

318 N. Carpenter

Deep Foundation
  • 3 Level Earth Retention System
  • 40 Caissons Installed
  • 16,000+ SF of Sheeting Installed

View Project