Walden Ravine
Earth Retention
- Nearly 1,300 SF of Retained Cantilevered Excavation
- Cantilever Depth up to 13'
- Pump Truck and Bucket Technique Needed to Fill Shafts
View Project
Salt Creek Intercepting Sewer
Earth Retention
- 7 Access Shafts Drilled
- Over 200' of Access Shafts Installed
- Up to 12' Diameter Holes
View Project
MWRD Stickney Tanks & Grit Building
Deep Foundation
- 1,800+ Steel H-Piles Installed
- 28 Micropiles
- 18,500+ SF of Earth Retained
View Project
Mutual Fuel Gas Works MGP
Earth Retention
- Design, Furnish, Install and Remove 3 Cofferdams
- Over 32,000 SF of Sheeting Installed
- Water Tight Cofferdam Achieved Using Corners and Interlock-Sealants
View Project
Lathrop Homes
Deep Foundation
- 30,000+ SF of Sheeting Installed
- 44 Belled Shafts Drilled
- 55 Soldier Piles Installed
View Project
ISTHA 4687 EOWA Adv. Earthwork & Ret. Wall
Earth Retention
- Over 550+ Soil Nails Installed
- Over 20' Retained Height
- 12,000+ Square Feet of Shotcrete Applied
View Project
IHBRR Bridge 47C
Deep Foundation
- Work Performed at Four Different Bridge Locations
- Installed 44 Piles for a New Abutment
- 35 Soldier Piles Installed for ERS
View Project
CNRR St Charles Line Bridges
Deep Foundation
- Low Clearance Micropile Drilling
- 210 Micropiles Installed
- Multiple Micropile Tests
View Project
CDOT Washington & Wabash CTA Station
Deep Foundation
- 135 Micropiles Installed
- 140+ Soldier Piles Installed
- 1000'+ of Waler Installed
View Project
CDOT Addison Underbridge
Marine Work
- 29,000+ Sq Ft of Sheeting Installed
- 7,000 Sq Ft of Soil Retained
- Excavations up to 14'
View Project
BNSF Retaining Wall 5.30N
Earth Retention
- 55' Long Piles
- Installed Along Active Railway
View Project
318 N. Carpenter
Deep Foundation
- 3 Level Earth Retention System
- 40 Caissons Installed
- 16,000+ SF of Sheeting Installed
View Project